Skip to content

How it works

From first call to first sunny day

About six weeks from signing to switch-on. Here is every step.

Our process

Six steps, one team

1. Free assessment

A 45-minute visit or video call. We look at your roof, your panel and a year of bills.

2. Design and quote

A fixed price, a panel layout and a month-by-month savings estimate, within 5 working days.

3. Permits and utility

We file the building permit and the utility interconnection. You sign, we chase.

4. Install day

Our crew installs most homes in one day, with fall protection and roof protection every time.

5. Inspection

The city inspects. The utility swaps your meter. Usually 2 to 4 weeks after install.

6. Switch on

We turn the system on with you, set up the monitoring app and show you what to watch.

Install day

What happens on your roof

The crew arrives at 7:30. They set up roof anchors and harnesses before anyone walks on the roof, lay protection over your shingles and install the racking. Panels go on by early afternoon, and our electrician wires the system to your panel.

Power to the house is off for about two hours. Before the crew leaves, they walk you through what they did and take photos for your file.

  • Fall protection on every roof, every time
  • Roof protection and magnet sweep for nails
  • Two-hour power shutoff, scheduled with you

Warranties

Covered for 25 years

25 years on panels

Manufacturer product and output warranty: at least 87% of rated output in year 25.

25 years on inverters

Microinverters or optimizers are covered for 25 years, parts and labor.

10 years on roof penetrations

Every roof mount is flashed and sealed. If it leaks, we fix the roof and the ceiling.

25 years on our work

Our workmanship warranty covers wiring, racking and anything we touched.

FAQ

Common questions

Is my roof good enough for solar?

Most roofs under 15 years old are. If yours needs replacing in the next few years, we will tell you and can coordinate with your roofer first.

Do I need to be home on install day?

Only for the first 15 minutes and the walk-through at the end. We need access to your electrical panel.

What if my system stops working?

Our monitoring usually spots a fault before you do. We send a technician within three working days, free under warranty.

Do panels need cleaning?

Rarely. Rain and snow keep them clean here. If you live by a dirt road, rinse them with a hose from the ground once a year.

Free solar assessment

See what solar would do for your bill

A 45-minute visit, a fixed-price quote and a month-by-month savings estimate. No pressure, no follow-up calls unless you ask.

← All demosGet ET Solar