Skip to content

Remodels

Plumbing for your bath or kitchen remodel

We work with homeowners and with your contractor. Rough-in, inspection and final fixture set.

Bathroom

Move the shower, add a second sink, go curbless

Most bathroom remodels need new drain and supply lines. We move the toilet flange, add a double vanity, install the shower valve at the right height and set the curbless shower drain so water goes where it should.

  • New PEX supply lines with a shutoff for every fixture
  • Shower valves and body sprays roughed in to plan
  • Toilet and tub moves on wood and slab floors
  • Final set of vanity, toilet and trim

Kitchen

Sinks, islands, dishwashers and gas lines

An island sink needs a vent, a pot filler needs a supply line and a gas range needs a properly sized gas line. We plan the runs with your cabinet layout so nothing has to be torn out twice.

  • Island sinks with code-approved venting
  • Dishwasher, ice maker and pot filler lines
  • Gas lines for ranges and cooktops
  • Garbage disposal and water filter installs

How it runs

A remodel job, step by step

1. Site visit

We look at your plans and the existing pipes, then send a fixed quote within two working days.

2. Permit

We pull the plumbing permit with the city. You never chase paperwork.

3. Rough-in

New lines run in one to three days, pressure tested and ready for the inspector.

4. Final set

After tile and cabinets, we come back to set fixtures and test everything.

Remodel prices

Typical remodel plumbing prices

  • Hall bath rough-in, same layout$2,400 to $3,600

    New supply and drain lines, shower valve, permit.

  • Primary bath with layout change$4,800 to $8,500

    Moves of toilet, tub or shower, double vanity.

  • Curbless shower drain and valve$1,650

    Linear drain set in the floor, valve roughed in.

  • Kitchen sink move, same wall$950 to $1,400

    Supply, drain and vent extended.

  • Island sink with vent$2,200 to $3,300

    Depends on floor and basement access.

  • Gas line for range$450 to $850

    Black iron or CSST, pressure tested.

Reviews

Contractors and homeowners on our remodel work

  • They roughed in the plumbing for our bathroom remodel on schedule and passed inspection the first time. Our contractor now calls them for every job.

    Nina CastellanoOwner, Fifth Avenue Kitchen & Bath
  • We moved the shower to the other wall and added a second sink. Copperline handled the permit and the inspector signed off in ten minutes.

    Rob and Ellen T.Clintonville
  • They came back on the day the counters went in, set the sink and faucet and checked every joint for leaks. Clean, quick and on budget.

    Priya S.Dublin
  • Our basement drain backed up on a Sunday night. Marcus was here in 45 minutes, cleared the main line and showed us the camera video of the root problem.

    Heather and Jon M.Grandview Heights

Flat-rate pricing

Know the price before we start the work.

Book online or call. We text you when your plumber is on the way, show you the price options on site, and you choose.

← All demosGet ET Plumbing