Toledo, OH · Contract fabrication since 1962
Heavy steel, built to print and on schedule.
Plate cutting, forming, welding, machining and paint for equipment builders. From five prototypes to 5,000 frames a year, with one schedule and one quality system.
Capabilities
Raw plate in, painted assemblies out
Keep one purchase order and one point of contact from the first cut to the finished, painted unit.
CNC machining
Horizontal boring, large vertical mills and turning for weldments and plate parts up to 12 ft long.
Plate and sheet metal
Plasma and fiber laser cutting, forming on press brakes up to 400 tons, and plate rolling.
Welding
MIG, flux-core and TIG on carbon steel, stainless and aluminum, plus two robotic weld cells.
Assembly and paint
Build-to-print assemblies with hydraulics and wiring, then blast and a two-coat paint line.

Our plant
Built for big, heavy parts
Our plant on Telegraph Road has 185,000 sq ft under roof, 20-ton bridge cranes in every bay and a rail spur for plate deliveries. Two shifts run five days a week, with Saturday overtime only when a customer asks for it.
- Plate stocked from 10 gauge to 3 in thick
- Kanban and blanket orders for repeat parts
- Our own trailers for deliveries within 300 miles
Industries
Who we build for
Agricultural equipment
Frames, hitches, hoppers and booms for planters, grain carts and sprayers.
Material handling
Conveyor sections, lift tables, racks and guarding for plants and warehouses.
Construction equipment
Buckets, attachments, counterweights and booms in abrasion-resistant plate.
Rail and transit
Brackets, step assemblies, battery boxes and underframe parts for railcar builders.
Process
From drawing to delivery
1. Send your package
Drawings, 3D models, quantities and target dates. We sign your NDA first if needed.
2. Quote in 3 days
A line-item quote with lead time, plus fabrication notes from our engineers.
3. First article
We build and inspect the first unit in full, and you sign off before the run starts.
4. Production and delivery
Built to schedule, painted, inspected and shipped on our trailers or yours.
Quality
Checked at every step
Certified quality system
Our quality management system is certified by an outside registrar and audited every year.
Code-qualified welders
Every welder is tested to written structural welding procedures and requalified each year.
Certified weld inspectors
Two certified weld inspectors on staff check fit-up, welds and paperwork on every job.
Full material traceability
Heat numbers follow every plate from receiving to shipping, with mill certs on file.
Reviews
What our customers say
Request a quote
Send drawings today. Get a quote in three working days.
Line-item pricing, lead times and fabrication notes from an engineer who has run the floor. Most quotes go out within three working days.