Projects
Recent work around Columbus
A few of the 60 or so jobs we finish each year, with the real prices.
60projects a year
38%of jobs from repeat customers
0subcontractors
5 yearsworkmanship warranty
Before and after
Every project starts with a tape measure
We measure twice on site and once more in the shop before a single board is cut. It is why our cabinets meet the wall without filler strips and our stairs pass inspection the first time.
- Laser and tape measured
- Drawings signed off before we build
- Photos sent at each stage

Reviews





